Developing Manpower Arrangement Using Work Measurement In FT and LH Packing + Weighing Line

Authors

  • Tze Keong Woo Politeknik Ungku Omar, Perak, Malaysia
  • Ilamaaran Murugan Politeknik Ungku Omar, Perak, Malaysia

Keywords:

work measurement, manpower arrangement

Abstract

This project is to study the work measurement and manpower arrangement of Company AD. Company AD is a food processing industry, where the main business is poultry processing. In this study, it has been identified Company AD’s one of the departments (EVI) is facing poor manpower arrangement, delay in production and absenteeism due to tiredness from previous day overtime working hours. To overcome this issue, it is necessary to measure the manpower productivity using work measurement and arrange the manpower accordingly. Stopwatch used to measure the workers’ performance in this project, where the workers’ productivity will be taken 2 times per day for 3 weeks. The data that been collected will be analyse and 2 workers will be chosen for each work so the
desired outputs of the study are work measurement and manpower arrangement. This change in manpower arrangement reduce the overtime working hours.

Downloads

Download data is not yet available.

Downloads

Published

2021-05-15

How to Cite

Tze Keong Woo, & Ilamaaran Murugan. (2021). Developing Manpower Arrangement Using Work Measurement In FT and LH Packing + Weighing Line. Jurnal Kejuruteraan, Teknologi and Sains Sosial (JKTSS), 7(1). Retrieved from https://jktss.puo.edu.my/jurnalpuo/index.php/jurnal/article/view/80

Similar Articles

<< < 1 2 

You may also start an advanced similarity search for this article.