Assessment Of Productivity Rate in Construction Management Using Ionic Framework

Authors

  • Famela Tan Department of Civil Engineering, Politeknik Ungku Omar
  • Rufaizal Che Mamat Department of Civil Engineering, Politeknik Ungku Omar
  • Azuin Ramli Department of Civil Engineering, Politeknik Ungku Omar

Keywords:

construction management, development, application, productivity rate, ionic framework

Abstract

Site management is critical in construction, but from the observation made, the issue is about documentation and reporting compilation which is difficult and wastestime to analyze productivity rate. The issues are specified for key in data for manpower and machinery of mast installation for overhead catenary system (OCS) that usesthe standard or traditional way such as daily site report in main office Kluang, Johor. This report is to develop an application of daily site report for assessment of productivity rate using Ionic Framework. The outcome of this development was tested in term of functionality to collected data using E-DSR and the respondents show 100% agreement on this product. Finally, this product can be used to produce productivity rate in OCS.

Downloads

Download data is not yet available.

Downloads

Published

2024-06-25

How to Cite

Famela Tan, Rufaizal Che Mamat, & Azuin Ramli. (2024). Assessment Of Productivity Rate in Construction Management Using Ionic Framework. Jurnal Kejuruteraan, Teknologi and Sains Sosial (JKTSS), 8(1), 1–29. Retrieved from https://jktss.puo.edu.my/jurnalpuo/index.php/jurnal/article/view/23

Similar Articles

1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.